A one-line email arrives from an overseas customer: "By 2030, switch the electricity used for the products you deliver to us to renewable energy." At a semiconductor parts factory in Gyeonggi Province, the purchasing team manager who received the email starts making calls. More than 3 GW of new solar PV is said to go up every year, yet the answers that come back are much the same. "We have no volume we can sell right now." "Call us again in 3 years." More power plants, but no electricity to buy.
New solar capacity per year (approx., see notes).
What do the numbers in the search bar say?
After hanging up, the manager types "buying renewable energy" into a search bar. The first numbers to appear are from the side that builds. New solar PV installed in 2024 came to about 4.0 GW. That is as if the installed capacity of two or three large nuclear reactors (1.4 GW class) were added every year.
| Year | New solar PV | New wind power |
|---|---|---|
| 2022 | about 3.3 GW (3,278,244 kW) | 237,595 kW |
| 2023 | about 3.7 GW (3,682,247 kW) | 219,164 kW |
| 2024 | about 4.0 GW (3,955,673 kW) | 113,101 kW |
Data Korea Energy Agency, New and Renewable Energy Deployment Statistics (new deployment capacity by year; unofficial translation)Source 2Korea Energy Agency, New and Renewable Energy Center, New and Renewable Energy Deployment Statistics (「신·재생에너지 보급통계」, new deployment capacity by year, kW; unofficial translation). The last year in the table is 2024.See in sources →·© Renuary
Installed capacity, though, measures "how big it was built." Solar PV rests at night and on cloudy days, so the amount of electricity it actually makes does not match that size. Wind power went the other way: in 2024 its new additions fell to less than half of 2022's.
Next come the numbers from the side that buys. RE100 RE100 is a voluntary campaign in which companies pledge to source 100% of their electricity from renewables. Glossary →, a global group of companies that have pledged to use 100% renewable energy, gathers its members' results every year and publishes a report. The three ratios in the 2025 report each measure something different.
- 12% — the share of the electricity members use in Korea that is recognized as renewable. A little more than one in ten.
- 43% — the share of the electricity used by all members that is recognized under the RE100 criteria.
- 5% — the share of members that have already reached 100% in Korea.Source 1The Climate Group, *RE100 Annual Disclosure Report 2025* (September 2026), Korea entries pp.38·42· news item "RE100 annual disclosure report"renewable share of members' electricity use in Korea (recognized basis).See in sources →
The 12% recognized share of members' electricity use in Korea falls far short of the 43% for all members. The two ratios have different denominators, so they can only be set side by side; they are not numbers to add or subtract. The bars on the building side grow longer every year, while the results on the buying side looked like this.
The manager picks up the phone again. This time the question is not "Do you have any?" but "Why don't you have any?"
Why can't the electricity reach the factory?
The first reason that comes back is wires. Even if a plant is built, if there is no way to send its electricity out, the electricity cannot reach the factory. A power plant has to be connected to the wires (the power grid) of Korea Electric Power Corporation (KEPCO), that is, the transmission grid and the Distribution line / distribution network The distribution network carries electricity from substations to neighbourhoods, homes and factories; each circuit in it is a distribution line. Glossary →. Connecting a plant to the power grid so it can send electricity is called Grid connection Grid connection is the work of linking a new power plant to the network so its power can actually be delivered. Glossary →.
According to a press release from the office of lawmaker Kim Wi-sang citing data submitted by KEPCO, renewable energy grid connection applications stood at 38,065 MW as of May 2026. Of these, 29,382 MW had been connected and 8,683 MW remained. Of what remained, 5,137 MW had secured a connection slot on the wires and was under construction, while 3,546 MW was waiting for connection because no slot was left on the wires. 2,298 MW, or 64.8% of that waiting volume, is concentrated in the Honam region.Source 3Office of National Assembly member Kim Wi-sang, press release (2026-10-06), citing data submitted by KEPCO and the Korea Energy Agency.See in sources →
Press release from Rep. Kim Wi-sang’s office (6 Oct 2026, citing data from the Korea Energy Agency and KEPCO; note 3).
Read this figure as text
A single stacked bar. The 38,065 MW of connection applications split three ways: 29,382 MW connected, 5,137 MW with a slot and under construction, 3,546 MW waiting with no slot. Under the waiting segment, the Honam share — 2,298 MW (64.8%) — is marked separately. As of May 2026.
Places with good sunlight and cheap land are far from the factories in the Seoul metropolitan area that use a lot of electricity. Power plants cluster in the southwest, and the wires there are already full. It is like a new town whose highway on-ramps are jammed. The houses are all built, but there is no road for the cars to get out.
Why can't you buy electricity that is already connected?
On the next call, the manager hears a different answer: "That plant already has an owner."
Not every plant connected to the wires is one a company can buy from. State-owned generation companies and large generators buy up volume through long-term contracts to meet the RPS (Renewable Portfolio Standard) RPS obliges designated generators and others to supply a share of their generation from renewables. They meet it by generating it themselves or buying RECs. Glossary →, the legal obligation to cover a certain share of their generation with renewable energy. There is also volume whose price was fixed in advance through government auctions (Fixed-price contract auction In a fixed-price contract auction, renewable developers bid for a government-set volume, and winners lock in a combined power-plus-REC price for the long term. Glossary →).
One plant's electricity cannot be sold to two buyers, and the rules block that too. A direct PPA is a power purchase contract that a business registered to sell renewable electricity signs directly with a company that uses power, without going through the electricity market. The direct trading rules set by the Ministry of Climate, Energy and Environment (the *Notice on Direct Power Trading of Renewable Electricity, etc.*, 「재생에너지전기의 직접전력거래 등에 관한 고시」, unofficial translation) bar a facility already used for another kind of deal, such as a third-party PPA in which KEPCO stands in the middle, from being tied into a direct PPA.Source 6Ministry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Ministry of Climate, Energy and Environment Notice No. 2025-61, effective 2025-12-24; unofficial translation), Art. 4(1)Korean Law Information Center.See in sources → Even if it is on the market, the electricity already has an owner.
There are also signs that buyers outnumber sellers. In August 2026, the Korea Energy Agency opened the "Renewable Energy Direct Power Trading (PPA) Brokerage Platform" (unofficial translation), where plants and companies look for trading partners. In the early hours of October 22, that screen showed 454 MW registered for sale and 585 MW for purchase.Source 5Korea Energy Agency, Renewable Energy Direct Power Trading (PPA) Brokerage Platform (「재생에너지 직접전력거래(PPA) 중개플랫폼」, ppa-energy.kr; unofficial translation), front page, registered capacity as of 2026-10-22 01:06. These are real-time values and change from moment to moment.See in sources → These are registered capacities posted as "want to buy" or "want to sell," not signed contracts. Even so, the buying side is larger by about 130 MW.
What a company wants to buy is usually a contract to receive "a set amount, in our company's name, for the next 20 years." That takes a plant that has no owner yet, or one newly built with a corporate contract in mind. How much of the thousands of megawatts counted in capacity statistics is of this kind is not broken out in public statistics.
The large deals that have been made public give a sense of the weight. In 2024, Hyundai Motor Group signed contracts with four generation businesses to procure 610 GWh every year for 20 years.Source 4Hyundai Motor Group, press release (2024-10-30)combined total of four companies, Hyundai E&C, SK E&S, GS E&R and Enlighten; 20 years.See in sources → Assuming a household that uses 300 kWh a month, that is the electricity about 170,000 households use in a year. That is how much a single deal takes off the market at once.
What does '3 years from now' mean?
The last layer is time. Building a new plant means clearing land, permits, wires and money in turn, so it usually takes several years. Yet the customer's email has a date stamped on it: "by 2030." Whether a plant that starts construction now can make that date becomes the heart of the contract.
So the "Call us again in 3 years" the manager heard is closer to an honest answer than a refusal. There is no volume to sell now, and volume that will exist in 3 years can only be secured by signing a contract now.
If capacity grows, does electricity to buy grow too?
A common assumption is that since solar PV grew every year, the volume companies can buy grew by as much. Lay the three answers the manager heard on top of one another, and you can see why this equation does not hold.
- Even if capacity grows, without wires the electricity cannot get out.
- Even if the electricity gets out, a company cannot buy it if it is already tied to another contract.
- Newly built volume may come online later than the date a company wants.
Widths show order, not proportions.
What is short is not panels but electricity that 'the wires reach, that has no owner yet, and that comes when it is wanted.'
Each number measures something different
The numbers in this piece each measure something different. When you carry them into a report or meeting materials, four places often trip people up.
- Installed capacity is not electricity made. 3.3 GW, 3.7 GW and 4.0 GW are the sizes of newly installed facilities. They differ, starting with the unit, from the amount of electricity actually made in a year (MWh).
- The volume waiting for connection is a number with a date attached. 3,546 MW is as of May 2026, and it is not taken straight from the original table KEPCO submitted but a value that has passed once through a lawmaker's press release. When the month changes, volume moves between the parts.
- Registered capacity is not a contract. The platform's 454 MW for sale and 585 MW for purchase are screen values at a single moment. The same volume may already have been sold through another route.
- RE100's three ratios have different denominators. For 12% it is members' use in Korea, for 43% all members' use, and for 5% the number of members. Put the three on one line and add or subtract them, and you get it wrong.
That is why a single number always comes with "what was measured, when, and by whom."
The manager's next call
The manager writes three lines on a notepad and calls again. This time, the call does not start with "Do you have volume to sell?" Is this plant connected to the wires, or has it secured a slot to connect? Is it still free of other contracts? Will its electricity come by 2030, the date the customer wrote?
A plant that answers "yes" to all three questions is a truly rare find in this market. If even one answer is "no," then however big the plant is, it is no answer to the customer's email. From the other end of the line comes "3 years from now" again. This time it sounds not like a refusal but like a schedule.
Words in this piece
- MW and MWh MW (megawatt) and MWh (megawatt-hour) are kW and kWh scaled up to the mega unit. They are used for large values such as plant size or power market volumes. Glossary → — units that measure the size of a power plant (MW) and the amount of electricity it actually made (MWh). Installed capacity is the former.
- Grid connection Grid connection is the work of linking a new power plant to the network so its power can actually be delivered. Glossary → — hooking a new power plant up to the power grid so that the electricity it makes can actually be sent.
- Distribution line / distribution network The distribution network carries electricity from substations to neighbourhoods, homes and factories; each circuit in it is a distribution line. Glossary → — the network of wires that carries electricity, stepped down at a substation, out to neighborhoods and factories.
- RPS (Renewable Portfolio Standard) RPS obliges designated generators and others to supply a share of their generation from renewables. They meet it by generating it themselves or buying RECs. Glossary → — a program that requires generation companies designated by the government to cover a certain share of their generation with renewable energy (Renewable Portfolio Standard). Much of this volume is tied up in long-term contracts.
- Direct PPA — a power purchase agreement signed directly between a seller of renewable electricity and a company that uses it, without going through KEPCO.
Sources (6)
Sources
- DataThe Climate Group, *RE100 Annual Disclosure Report 2025* (September 2026), Korea entries pp.38·42· news item "RE100 annual disclosure report" ↩renewable share of members' electricity use in Korea (recognized basis).
- DataKorea Energy Agency, New and Renewable Energy Center, New and Renewable Energy Deployment Statistics (「신·재생에너지 보급통계」, new deployment capacity by year, kW; unofficial translation). The last year in the table is 2024. ↩
- ReleaseOffice of National Assembly member Kim Wi-sang, press release (2026-10-06), citing data submitted by KEPCO and the Korea Energy Agency. ↩
- ReleaseHyundai Motor Group, press release (2024-10-30) ↩combined total of four companies, Hyundai E&C, SK E&S, GS E&R and Enlighten; 20 years.
- Korea Energy Agency, Renewable Energy Direct Power Trading (PPA) Brokerage Platform (「재생에너지 직접전력거래(PPA) 중개플랫폼」, ppa-energy.kr; unofficial translation), front page, registered capacity as of 2026-10-22 01:06. These are real-time values and change from moment to moment. ↩
- LawMinistry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Ministry of Climate, Energy and Environment Notice No. 2025-61, effective 2025-12-24; unofficial translation), Art. 4(1) ↩Korean Law Information Center.