Grid Constraint
transmission constraint · transmission congestion · grid congestion · 계통제약
A grid constraint is when line capacity or grid stability rules prevent running the cheapest generators first, in order. The typical case is a transmission constraint.
KPX must manage grid constraints and congestion in light of the physical state of the transmission system, and do so in the most economic and effective way. The Electric Utility Act defines a mismatch between generation capacity and transmission capacity as a 'transmission constraint'.
Korea's day-ahead market is a physical-grid-based market that builds its schedule while reflecting transmission constraints, generators' self-constraints and reserve constraints. So a cheap generator may run less because of transmission lines, or an expensive one may have to run to keep a particular area stable. Generators that must run because of grid constraints can be excluded from setting SMP, and variable costs they cannot recover at the market price are covered by a separate settlement payment.
News-reading tip: stories saying 'the plant is built but can't run because there are no transmission lines' are about grid constraints. The resulting costs are shared across the whole market through constrained generation and settlement.
Sources
- 전력시장운영규칙(2026-07-25 시행) 제5.4.2조(계통제약 및 송전혼잡관리)
- 전력시장운영규칙(2026-07-25 시행) 제2.4.2조 제5항 제8호(가격결정자격: 계통제약 발전기)
- 전기사업법 제2조 제12호의14(송전제약 정의)
- KPX 2026 전력거래사 학습가이드 §2.1.1 p.52, p.74–75(실계통기반 하루전시장·정산), §3.3 p.145(송전제약)