Grid connection
interconnection · grid access
Grid connection is the work of linking a new power plant to the network so its power can actually be delivered.
Even a finished plant cannot sell power until it is tied to transmission or distribution lines and a substation. So the developer applies to KEPCO for connection and has KEPCO carry out a technical review.
How to read it: where the grid has no spare room, connection is delayed. In areas where renewables have grown quickly, waiting for grid connection becomes a major obstacle.