SMP merit-order simulator
As demand rises, plants switch on from the cheapest. The cost of the last price-setting unit is the SMP.
Capacities are actual (KPX 2025). Costs are illustrative — actual unit variable costs are not public.
Price set by: Coal
Read as supply and demand: the steps are the supply curve, cheapest first; the dashed line is demand (held fixed whatever the price, in this tool); the orange dot is where they meet — its height is the SMP.
| Source (cheapest first) | Capacity | Cost (illustrative) | Running |
|---|---|---|---|
| Renewablesreflected separately in the day-ahead plan first | 19.5 GW | 0 | 19.5 GW |
| Nuclear | 26.1 GW | 10 | 26.1 GW |
| Coal | 41.7 GW | 90 | 34.5 GW |
| LNG | 48.4 GW | 150 | 0 GW |
| Oil | 0.5 GW | 250 | 0 GW |
Not in this calculation
- Actual variable costs per unit — costs are illustrative; only the order is realistic
- Pumped storage and other plant
- Grid constraints, start-up and shut-down time and cost, plant out for maintenance
- Demand changing through the day — this is a single hour
- Price-responsive demand — demand is a vertical line here
- How much renewables will actually grow and how big the effect is — the slider is an assumption
Using the example values
Explained in #3 SMP, the wholesale price of electricity — the price the last generator sets. Shows the mechanism; does not forecast prices.
Check next
Embed this tool
Paste the code below; the source line and link come with it (CC BY 4.0). Numbers are examples.
Preview