SMP merit-order simulator

As demand rises, plants switch on from the cheapest. The cost of the last price-setting unit is the SMP.

Capacities are actual (KPX 2025). Costs are illustrative — actual unit variable costs are not public.

SMP90KRW/kWh

Price set by: Coal

070140210280RenewablesNuclearCoalLNGDemandGW →KRW/kWh ↑

Read as supply and demand: the steps are the supply curve, cheapest first; the dashed line is demand (held fixed whatever the price, in this tool); the orange dot is where they meet — its height is the SMP.

Source (cheapest first)CapacityCost (illustrative)Running
Renewablesreflected separately in the day-ahead plan first19.5 GW019.5 GW
Nuclear26.1 GW1026.1 GW
Coal41.7 GW9034.5 GW
LNG48.4 GW1500 GW
Oil0.5 GW2500 GW

Not in this calculation

  • Actual variable costs per unit — costs are illustrative; only the order is realistic
  • Pumped storage and other plant
  • Grid constraints, start-up and shut-down time and cost, plant out for maintenance
  • Demand changing through the day — this is a single hour
  • Price-responsive demand — demand is a vertical line here
  • How much renewables will actually grow and how big the effect is — the slider is an assumption

Using the example values

Explained in #3 SMP, the wholesale price of electricity — the price the last generator sets. Shows the mechanism; does not forecast prices.

Check next

  1. 01What the SMP actually was — monthly and annual
  2. 02Which hours are cheap and which expensive
  3. 03How much capacity sits in the merit order
Embed this tool

Paste the code below; the source line and link come with it (CC BY 4.0). Numbers are examples.

Preview