Published
- Over 20 years
- How long a power plant has to keep selling its electricity
Contents (9)
- 01From a bundle of paperwork to a power plant
- 02The company that promised a date and a level of performance
- 03What the panel company sells along with the panels
- 04From the day after the ribbon is cut
- 05The business cards missing from the ribbon line
- 06The agencies hold the rules and the gates
- 07So who sells the electricity?
- 08After the ribbon is cut: when the money comes in
- 09Words in this piece
A power plant's story doesn't end when it is built. Construction money changes hands while it goes up, but the electricity is sold for more than 20 years afterward. That is why the company that built a plant and the company holding the right to sell its electricity can be different.
Beside a reservoir in South Chungcheong Province, a hypothetical 20 MW solar plant is holding its opening ceremony. In front of the ribbon stand the developer who lined up the land and permits, the construction company that did the building, the panel manufacturer, the management company that will look after the plant once it is running, and a representative of the company that will buy its electricity. None of these five may hold the right to sell the electricity. That is the case unless the developer keeps the plant to the end. The plant and the people are a hypothetical case made up for this explanation.
So "renewable energy supply" in a company brochure doesn't mean just one thing. It might be development rights, the construction work of building a plant, or equipment or management services. Follow the five in front of the ribbon one at a time, and what each one sells, and when each one gets paid, falls into place.
From a bundle of paperwork to a power plant
To the head of the development company, this plant was a bundle of paperwork until a few years ago. The company secured the land, talked with local residents, and obtained a Generation licence A generation licence is the permit a person needs from the minister or a provincial governor to run a business that generates and sells electricity. Glossary → and a development activity permit. It applied to KEPCO for Grid connection Grid connection is the work of linking a new power plant to the network so its power can actually be delivered. Glossary →, that is, for permission to link the plant to the power grid so it can send out electricity. A company that finds a "project likely to work" like this and carries it to the point where it can actually be built is a developer.
What a developer sells is these "development rights." The more the permits and the connection are locked in, the lower the project's risk, and the higher the price climbs, even for the same 20 MW. Some developers run their plants themselves to the end, but many hand the development rights to a bigger generation company or an investor just before construction starts. Once the rights change hands, the one who will later sell the electricity is the new owner too.
The company that promised a date and a level of performance
The site manager's company drew the plans, bought the materials and built this plant. When it signed the contract, it promised to finish on a set date with a set level of performance. That is a completion guarantee. If the plant is late or falls short on performance, the company pays for it. Banks look at this promise too when deciding whether to lend. Having one company bundle engineering, procurement and construction like this is called EPC (engineering, procurement and construction) EPC is a contract under which one company designs a power plant, buys its equipment, builds it and hands it over. Glossary →, and that company is the contractor.
What the contractor buys and installs shows in where the money goes. For floating solar, built to float on water, 23% of the project cost goes to the float structures that hold the panels up on the water.Source 1Korea Energy Economics Institute (KEEI), *Basic Research Report 2024-22* (「기본연구보고서」; unofficial translation), p.15project cost breakdown for building-mounted (1 MW) and floating (3 MW) solar. The two differ in scale, so they are not used to rank the types by cost.See in sources → Even within solar, the center of gravity of the money shifts depending on where a plant is built.
| Type | Project cost breakdown in a Korea Energy Economics Institute study |
|---|---|
| Floating solar | Modules 21% · float structures 23% · electrical work 20% |
| Building-mounted solar | Modules 29% |
Data Korea Energy Economics Institute (KEEI)·© Renuary
An EPC contractor earns its money from the construction contract. What price the plant gets for its electricity after completion is, in principle, not the EPC contractor's business.
What the panel company sells along with the panels
What the sales director handed over was not just modules (panels) and inverters. A manufacturer sells a performance guarantee along with the equipment. It promises in advance how well the equipment will run and takes responsibility if it falls short. For panels, the promise is what percentage of their original output they will still deliver after 25 years; for a wind turbine, what percentage of the time over a 1-year period it will run without stopping. In the industry, such companies are also called OEMs (original equipment manufacturers).
With wind, the manufacturer stays around even longer. Turbines are a big chunk of the project cost, and when one breaks down, it is hard to fix without the manufacturer's technicians. So wind turbine manufacturers often stay on through maintenance contracts after selling the equipment.
From the day after the ribbon is cut
The management company team leader's work begins the day after the opening ceremony. The team cleans panels, cuts weeds, replaces broken inverters and checks generation every day. This work is called O&M, short for operation and maintenance. In apartment terms, it is the management office after people move in.
A plant's income comes down to how long it produces electricity without stopping, and O&M protects that income. An O&M company is paid a management fee every year. It isn't glamorous, but it is income that doesn't stop for 20 years.
The business cards missing from the ribbon line
Some companies didn't come to the ceremony. Companies that want to buy electricity and generation companies that want to sell it often don't know each other. Brokers (supply and procurement service companies) sit between them: they find counterparties, design the contract structure, and handle on the parties' behalf the steps for trading Renewable Energy Certificates (RECs), which prove the value of power made from renewable energy. When one company needs to buy a little from several plants, putting that bundle together is also their job.
The rules leave room for such bundles too. A power purchase agreement (PPA) signed directly between the seller and the company using the power, without going through KEPCO, is called a direct PPA. Here the seller can also supply electricity from another company's plant, on condition that it signs a separate supply contract with that plant.Source 2Ministry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Notice No. 2025-61, effective 2025-12-24; unofficial translation), Art. 9(5).See in sources →
Advisers handle legal, accounting and technical due diligence. Due diligence is the investigation of documents and the site in person before a purchase. When an investor buys development rights, advisers check on its behalf questions like "Is this permit really valid?" and "Can this generation forecast be trusted?" The bigger the deal, the more an adviser's sign-off becomes a precondition of the contract.
The ones waiting for that sign-off are the investors. Those who buy equity and become owners look for dividends (money a company pays out of its earnings to its owners) and for a gain when they later sell; banks that lend money look at interest and repayment of principal. What they want differs, but what they ask is the same: Can this plant get built, and once built, to whom and at what price will it sell its electricity? That is why, to investors, a project that is "ready" is more attractive than a big one, and it is also why developers work so hard to raise the value of their bundle of paperwork.
The agencies hold the rules and the gates
There are places a deal has to pass through even if they never sign the contract. Who your counterparty is and who runs the system are separate questions. The rules are made by the Ministry of Climate, Energy and Environment. It is in charge of the RPS (Renewable Portfolio Standard) RPS obliges designated generators and others to supply a share of their generation from renewables. They meet it by generating it themselves or buying RECs. Glossary →, which requires designated generation companies to fill a set share with renewable energy, and of the coming 2027 renewable contract market (renewable capacity contract scheme) From 2027 the minister may run this scheme: renewable capacity is contracted long-term at fixed prices, and decree-designated buyers may be made to buy its power. Not today's REC contract market. Glossary → system, and it approves the Basic Terms and Conditions of Supply, the document in which KEPCO sets out its tariffs and supply conditions.Source 3Ministry of Government Legislation, Korean Law Information Center, *Act on the Promotion of the Development, Use and Diffusion of Renewable Energy* (「재생에너지 개발ㆍ이용ㆍ보급 촉진법」; unofficial translation), Art. 12-5(3) (public notice of mandatory suppliers)· the same Act (Act No. 21943, effective 2027-01-01), Art. 12-14 (contract market)· *Electric Utility Act* (「전기사업법」), Art. 16(1) (approval of the terms).See in sources → The approval of those terms is reviewed by the Electricity Regulatory Commission The Electricity Regulatory Commission is a government body that deliberates on fair competition and consumer protection in the power sector and adjudicates disputes between electricity businesses. Glossary →.Source 4Ministry of Government Legislation, Korean Law Information Center, *Electric Utility Act* (「전기사업법」), Art. 53 (Electricity Regulatory Commission).See in sources →
The other agencies show up at each stage of a deal. When you choose a plant site, the local government comes first. It is the gateway to permits and consultation with residents. When you sell electricity into the market and get paid, you pass through the Korea Power Exchange (KPX). It opens the electricity market and the small-scale power brokerage market, where electricity from small plants is pooled and traded, and it handles power grid operation and settlement.Source 5Ministry of Government Legislation, Korean Law Information Center, *Electric Utility Act* (「전기사업법」), Arts. 35 and 36(1) (duties of the Korea Power Exchange).See in sources → When you receive RECs, you meet the Korea Energy Agency's New and Renewable Energy Center. It supports fulfillment of supply obligations and certification work, and RECs are handled by a certificate issuing agency designated by the minister.Source 6Ministry of Government Legislation, Korean Law Information Center, *Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy* (「신에너지 및 재생에너지 개발ㆍ이용ㆍ보급 촉진법」), Art. 31(1)· Enforcement Decree of the same Act, Art. 29 (New and Renewable Energy Center).See in sources →
| Agency | What it does | When you meet it in a deal |
|---|---|---|
| Local government | Gateway to siting, permits and consultation with residents | When you choose a plant site |
| Korea Power Exchange (KPX) | Runs the electricity market and the small-scale power brokerage market; power grid operation and settlement | When you sell electricity into the market and get paid |
| Korea Energy Agency's New and Renewable Energy Center | Supports fulfillment of supply obligations and certification work | When you receive RECs |
| Ministry of Climate, Energy and Environment · Electricity Regulatory Commission | Renewable energy programs and approval of the terms · review of that approval | When the rules are set or changed |
Data compiled by·© Renuary
So who sells the electricity?
Back to the ribbon. Neither the construction company that did the building nor the manufacturer that made the panels sells electricity. The one that sells the electricity, along with the REC (Renewable Energy Certificate) A REC is the issuing and trading unit of a certificate proving renewable supply. Renewable generators earn income from selling RECs, apart from selling electricity. Glossary → carrying the value of its having been made from renewable energy, is the plant's owner, that is, the generation company. If the developer keeps the plant to the end, the developer sells it; if it has handed over the development rights, the new owner does. So the seller is among the five in front of the ribbon only when the developer keeps the plant to the end. There is also a route, like a direct PPA, where another business signs a separate supply contract with the owner and sells that electricity, but even then the starting point is the contract with the owner.
Under the same word "supply," each one sells something different. A generation company sells electricity it has already made; a developer sells the development rights to a plant that doesn't exist yet, or a future supply opportunity. A generation company may also sell the plant itself or equity (a share of ownership in the company). Brokers sell supply services, including contracts and settlement; contractors sell construction; equipment companies sell modules, inverters and wind turbines. Companies that deal in certificates help buyers obtain proof that power was produced from renewable energy.
| Role | What it does | How it makes money |
|---|---|---|
| Developer | Secures land, permits and grid connection | Rising value and sale of development rights, or running the plant itself |
| EPC (contractor) | Engineering, procurement and construction; completion guarantee | Construction contract payments |
| Manufacturer (OEM) | Supplies modules, inverters and turbines; performance guarantee | Equipment payments, maintenance contracts |
| O&M | Operation and maintenance | Annual management fee |
| Broker (supply and procurement services) | Finds counterparties, designs contract structures, handles RECs | Fees |
| Adviser | Legal, accounting and technical due diligence | Advisory fees |
| Generation company (owner) | Sells electricity and RECs | Electricity sales revenue, REC revenue |
Data compiled by·© Renuary
The question "Can you supply us with electricity for 10 years starting in 2027?" is not one for a contractor or a certificate company to answer. You can only tell who your real counterparty is once you see whether the generation company sells directly or another supplier signs a contract and sells. Even a plant built by a well-known construction company may leave the builder with no right to sell its power. The first thing to check is not "Who built it?" but "Who owns it now, and is its electricity still unsold?"
The table is tidy, but real companies are not. Within one large conglomerate, the solar division may come to the same event on the supply side and the chemicals division on the buying side. A construction company may do the construction and also put equity into the generation business. As important as the company's name is "Which department is this person in, and what can they decide?"
When you read news of a power plant supply contract, there are four things to ask.
- Which of these is the company selling: development rights, construction, equipment, management or electricity?
- Who owns the plant now, and who holds the right to sell its electricity?
- Is the counterparty to the contract a generation company or a separate supplier?
- Has the electricity they promise to supply already been sold or contracted elsewhere?
After the ribbon is cut: when the money comes in
The five at the opening ceremony each get paid at a different time. The developer when it hands over the development rights, the contractor as construction goes along, the manufacturer when it delivers the equipment, and the management company every year. The fifth, the buying company's representative, is the one paying instead. It pays for the electricity the whole time it receives it.
A shape-only sketch. Even on one plant, who gets paid when differs — early, over the long run, or paying out.
By the moment the ribbon is cut, the construction and equipment costs have all been paid out. The money from selling electricity comes in from now on, over 20 years. Of the five who cut the ribbon amid the applause, none may be the one who receives that money.
Words in this piece
- Generation licence A generation licence is the permit a person needs from the minister or a provincial governor to run a business that generates and sells electricity. Glossary → — the license you must obtain first to run a business making and selling electricity. It is the first document a developer brings in.
- Grid connection Grid connection is the work of linking a new power plant to the network so its power can actually be delivered. Glossary → — linking a new power plant to the power grid so the electricity it makes can actually be sent out.
- EPC (engineering, procurement and construction) EPC is a contract under which one company designs a power plant, buys its equipment, builds it and hands it over. Glossary → — an arrangement in which one company bundles designing a power plant, buying the materials, building it and handing it over. That company is the contractor.
- REC (Renewable Energy Certificate) A REC is the issuing and trading unit of a certificate proving renewable supply. Renewable generators earn income from selling RECs, apart from selling electricity. Glossary → — a certificate, bought and sold, that carries the value (environmental attribute) of power having been made from renewable energy. It can be sold separately from the electricity.
- Broker — a company that sits between companies that want to buy and plants that want to sell, finding counterparties and handling contracts and settlement. Also called a supply and procurement service company.
- RPS (Renewable Portfolio Standard) RPS obliges designated generators and others to supply a share of their generation from renewables. They meet it by generating it themselves or buying RECs. Glossary → — a program that requires generation companies designated by the government to fill a set share of their generation with renewable energy (Renewable Portfolio Standard).
- 2027 renewable contract market (renewable capacity contract scheme) From 2027 the minister may run this scheme: renewable capacity is contracted long-term at fixed prices, and decree-designated buyers may be made to buy its power. Not today's REC contract market. Glossary → — a system the minister can run from 2027, under which designated businesses can be made to buy the electricity of renewable energy facilities selected in bidding and installed, through contracts such as long-term fixed-price ones.
- Electricity Regulatory Commission The Electricity Regulatory Commission is a government body that deliberates on fair competition and consumer protection in the power sector and adjudicates disputes between electricity businesses. Glossary → — a body that deliberates on matters of fair competition in the electricity business and protection of electricity users.
- Generation company — the owner of a power plant. It sells that plant's electricity and RECs.
Sources (6)
Sources
- DataKorea Energy Economics Institute (KEEI), *Basic Research Report 2024-22* (「기본연구보고서」; unofficial translation), p.15 ↩project cost breakdown for building-mounted (1 MW) and floating (3 MW) solar. The two differ in scale, so they are not used to rank the types by cost.
- LawMinistry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Notice No. 2025-61, effective 2025-12-24; unofficial translation), Art. 9(5). ↩
- LawMinistry of Government Legislation, Korean Law Information Center, *Act on the Promotion of the Development, Use and Diffusion of Renewable Energy* (「재생에너지 개발ㆍ이용ㆍ보급 촉진법」; unofficial translation), Art. 12-5(3) (public notice of mandatory suppliers)· the same Act (Act No. 21943, effective 2027-01-01), Art. 12-14 (contract market)· *Electric Utility Act* (「전기사업법」), Art. 16(1) (approval of the terms). ↩
- LawMinistry of Government Legislation, Korean Law Information Center, *Electric Utility Act* (「전기사업법」), Art. 53 (Electricity Regulatory Commission). ↩
- LawMinistry of Government Legislation, Korean Law Information Center, *Electric Utility Act* (「전기사업법」), Arts. 35 and 36(1) (duties of the Korea Power Exchange). ↩
- LawMinistry of Government Legislation, Korean Law Information Center, *Act on the Promotion of the Development, Use and Diffusion of New and Renewable Energy* (「신에너지 및 재생에너지 개발ㆍ이용ㆍ보급 촉진법」), Art. 31(1)· Enforcement Decree of the same Act, Art. 29 (New and Renewable Energy Center). ↩
Ask about this postQuestions shape the next pieces
Comments
- Loading…