Published
- 240,000 kW
- September 15, 2011: the margin left
Contents (8)
- 01Why is electricity hard to stockpile?
- 02What went wrong that afternoon?
- 03Why is the company that makes power not the one that sells it?
- 04With no warehouse, how is electricity priced and how is a margin kept?
- 05Why do "KEPCO in the red" and "SMP soars" show up together?
- 06Same number, but compared with what?
- 07Where does the refrigerator get its power at 11 p.m.?
- 08Words in this piece
At 3:11 p.m. on September 15, 2011, lights began going out, one after another, all over Korea. Elevators stopped and traffic lights went dark. It was not a war, and it was not a typhoon. That day there was simply a little too little electricity.
Cities had their power cut over a small shortfall because electricity is hard to store in bulk. What power plants make and what people use have to match in the moment, and that day showed what happens when the balance breaks.Source 4Ministry of Knowledge Economy, *Minister's briefing on measures following the power outage* (「지식경제부 장관 정전사태 대책 브리핑」, Korea Policy Briefing, 2011-09-18; unofficial translation)See in sources →Source 3Government of Korea (joint), *Results of the joint government investigation into the causes of the September 15 power outage* (「정부 합동 9·15 정전사태 원인 조사 결과 발표」, Korea Policy Briefing, 2011-09-26; unofficial translation)See in sources →
Korea's electricity market stands on this physical constraint. In 2001 the generation side split off from KEPCO (Korea Electric Power Corporation), and several generation companies began selling electricity into the market. KEPCO buys that electricity and sells it to homes and factories, while the Korea Power Exchange (KPX) sets the trading price and runs the power system, matching generation and demand hour by hour.Source 9Korea Electric Power Corporation (KEPCO), *Restructuring of the Power Industry* (「전력산업 구조개편」, official history)six generation companies launched 2001-04-02· Korea Power Exchange, *Company Overview* (「회사개요」, established 2001-04-02; unofficial translation)See in sources →Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources → It also explains why the bill carries KEPCO's name while the news runs "SMP soars" and "KEPCO in the red" side by side.
Why is electricity hard to stockpile?
Rice is kept in a warehouse and sold later. Gasoline is kept in a tank. If it doesn't sell today, it can sell tomorrow.
Electricity is different. Electricity made at a power plant travels down the wires and is used somewhere almost the instant it is made. There are ways to store it. There are batteries, and there is pumped-storage hydropower, which uses spare electricity to pump water uphill and lets it flow back down to make electricity when it is needed. But next to what the whole country uses, these are still small, a little is lost between putting electricity in and taking it out, and they cost money. So the power grid runs by matching the amount made and the amount used at every moment.
When the two drift apart, the first thing to wobble is electricity's beat, the Frequency Frequency is how fast alternating current changes direction; it signals whether supply and demand balance. It falls when supply is short and rises when there is a surplus. Glossary →. Korea requires that in normal times the frequency be held within 0.2 Hz above or below 60 Hz (hertz, the unit of frequency).Source 6Ministry of Climate, Energy and Environment, *Enforcement Rule of the Electric Utility Act* (「전기사업법 시행규칙」, Ministerial Ordinance No. 63, in force from 2026-10-16; unofficial translation), Art. 18· Annex 3 item 2 (standard frequency 60 Hz, tolerance within 0.2 Hz above or below)See in sources →Source 1Ministry of Climate, Energy and Environment, *Standards for Maintaining Power System Reliability and Electricity Quality* (「전력계통 신뢰도 및 전기품질 유지기준」, No. 2025-165, in force from 2025-10-01; unofficial translation), Art. 4See in sources → Stray far outside that band and protective devices kick in to save the equipment; in bad cases, a wide area loses power all at once.
So someone is always watching the whole power grid and turning generators up and down. In Korea, KPX does this job, and it is called Dispatch and Merit Order Dispatch is KPX telling generators when and how much to run. In principle it follows the market's priority order: generators with the lowest variable cost run first. Glossary →.Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources →
What went wrong that afternoon?
That day's weather forecast called for a high of 33°C. Yet the demand forecast was still the figure set on September 7 on the basis of 28°C.Source 3Government of Korea (joint), *Results of the joint government investigation into the causes of the September 15 power outage* (「정부 합동 9·15 정전사태 원인 조사 결과 발표」, Korea Policy Briefing, 2011-09-26; unofficial translation)See in sources → In the list below, kW (kilowatt) is the amount of power that can be used or produced at a single instant.
- Forecast demand → 64 million kW
- Actual demand → 67.26 million kWSource 4Ministry of Knowledge Economy, *Minister's briefing on measures following the power outage* (「지식경제부 장관 정전사태 대책 브리핑」, Korea Policy Briefing, 2011-09-18; unofficial translation)See in sources →
- Generating capacity reported as ready to run → overstated by 3.19 million kW. Of that, 2.02 million kW came from counting generators that need about five hours of warming up (preheating) before they can start but had not been ordered to warm up, and 1.17 million kW was operating error.Source 4Ministry of Knowledge Economy, *Minister's briefing on measures following the power outage* (「지식경제부 장관 정전사태 대책 브리핑」, Korea Policy Briefing, 2011-09-18; unofficial translation)See in sources →Source 3Government of Korea (joint), *Results of the joint government investigation into the causes of the September 15 power outage* (「정부 합동 9·15 정전사태 원인 조사 결과 발표」, Korea Policy Briefing, 2011-09-26; unofficial translation)See in sources →
The government later estimated the margin at that moment at 240,000 kW.Source 4Ministry of Knowledge Economy, *Minister's briefing on measures following the power outage* (「지식경제부 장관 정전사태 대책 브리핑」, Korea Policy Briefing, 2011-09-18; unofficial translation)See in sources → The margin left was less than 0.4% of what was being used (240,000 kW ÷ 67.26 million kW).
At 3:11 p.m., KEPCO cut power to the first region. By 4:11 p.m., 13 regional dispatch offices had cut their regions in turn.Source 3Government of Korea (joint), *Results of the joint government investigation into the causes of the September 15 power outage* (「정부 합동 9·15 정전사태 원인 조사 결과 발표」, Korea Policy Briefing, 2011-09-26; unofficial translation)See in sources → These were rolling blackouts, switched off deliberately and in pieces to prevent a total blackout of the whole country.
At 4:47 p.m. a request to lift the cuts went out, and the last cut was lifted at 7:56 p.m.Source 3Government of Korea (joint), *Results of the joint government investigation into the causes of the September 15 power outage* (「정부 합동 9·15 정전사태 원인 조사 결과 발표」, Korea Policy Briefing, 2011-09-26; unofficial translation)See in sources → A joint government investigation named the biggest cause of the day as "a failure of judgment about the demand forecast and supply capacity."
- Forecast 64.00 GWBased on 28°C; the forecast for the day was 33°C
- Actual 67.26 GWSupply capacity overstated by 3.19 GW (2.02 not warmed up + 1.17 operating error)
- Margin 0.24 GWGovernment estimate — under 0.4 per 100 used
- Rolling cuts begin13 regional dispatch centers in turn
- All restoredCut in turn to prevent a nationwide blackout
Figures from government announcements, including the joint inquiry (26 Sep 2011). The 0.24 GW margin is an estimate on a different basis from today’s alert thresholds.
With a warehouse, they could have taken some out that afternoon. With no warehouse, the only choice was where to switch off.
Why is the company that makes power not the one that sells it?
That afternoon, the request to cut power came from KPX, and the one that cut it, region by region, was KEPCO. The body that drew up the plan and the body that supplied the electricity were different. In the everyday buying and selling of electricity, too, each has its own seat.
A fish auction has three seats: the seller, the buyer, and the house that sets the price and settles the deals. The electricity market likewise splits into three seats: the generation companies that make power, KEPCO that buys it, and KPX that runs the market. The difference is that fish moves in boxes, while electricity mixes on the wires with power from other plants.
The sellers are the generation companies. KEPCO's generation subsidiaries, private generation companies and renewable energy business operators sell the electricity they make into the market. The buyer is mostly KEPCO. It carries the electricity it buys in the market over the transmission grid, which spans long distances, and the Distribution line / distribution network The distribution network carries electricity from substations to neighbourhoods, homes and factories; each circuit in it is a distribution line. Glossary →, which shares it out to neighborhoods, then sells it to homes and factories and collects payment under the electricity tariff. It is wholesaler and corner shop at once.
The one that runs the market is KPX. It sets the price for each hour, instructs which generators run and how much, and calculates and pays out the amounts due (settlement).Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources → The operator that matches the amount made and the amount used at every moment also sits in this seat.
The three seats were split on April 2, 2001. The generation side broke away from KEPCO and became six companies: Korea Hydro & Nuclear Power and the Southeast, Midland, Western, Southern and East-West Power companies. The same day, KPX opened its doors.Source 9Korea Electric Power Corporation (KEPCO), *Restructuring of the Power Industry* (「전력산업 구조개편」, official history)six generation companies launched 2001-04-02· Korea Power Exchange, *Company Overview* (「회사개요」, established 2001-04-02; unofficial translation)See in sources → The generation subsidiaries are still KEPCO's subsidiaries, but in the market they sell power separately and are paid separately. KEPCO is both the company that sends the bill and the company that buys electricity in the market. The company that makes electricity and the company that sells it to your home do not sit in the same seat.
With no warehouse, how is electricity priced and how is a margin kept?
The fact that electricity is hard to stockpile decides most of how the three seats buy and sell it. So four mechanisms came about.
The first is deciding the day before and fixing it on the day. The day before, the market plans which generators will run, and how much, in each hour of the next day, based on the demand forecast and the generation companies' bids.Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources → Weather and demand differ a little from the forecast, so on the day itself the operator adjusts generator output to cover the gap. That day in 2011 was a day when the "day before" went badly wrong. A 33°C afternoon arrived on top of a plan set for 28°C.
- Demand forecastDay beforeEstimate each hour of tomorrow
- Generation planDay beforeLine up units cheapest first
- Real-time dispatchSame dayOrder units up or down to close forecast errors
- Hold frequencyNowMatch supply and demand every moment
KPX’s job in time order. When forecasts miss badly and reserves run out, cuts in turn — as in 2011 — follow.
The second is a price that differs by the hour. In the small hours, when customers are few, running only the cheap generators is enough. When customers crowd in, even the expensive ones have to come on. So the electricity actually made in each hour is paid for on the basis of that hour's wholesale price, the SMP (System Marginal Price) SMP is the energy price set for each trading hour in the power market. It is the highest generation price among the generators eligible to set the price in that hour. Glossary → (System Marginal Price).Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources → It is the equivalent of the auction price at the fish auction. Because it is the yardstick for paying for the electricity that generation companies sell into the market, it is a different number from the unit rate of the electricity tariff on your bill.
The third is money paid even to facilities that don't run. Since there must be no shortage even in the single busiest hour, facilities that rarely run in normal times have to be kept on hand too.
How much is kept standing by shows in the 2025 figures. MW (megawatt) is the amount of power a generator can put out at a single instant, a thousand times a kW, and GW is a thousand times an MW. GWh (gigawatt-hour) is the amount of electricity actually made by running at that power for a full hour.
| 2025 | Value |
|---|---|
| Facilities in the electricity market at year-end | 146,157 MW |
| Electricity traded in the market that year | 547,163 GWh (provisional, not yet final) |
| If those facilities had run flat out for all 8,760 hours of the year | about 1,280,335 GWh |
| Actual traded volume as a share of that | about 43% |
The 1,280,335 GWh and 43% are Renuary's calculationSource 5Korea Power Exchange (KPX), *2025 Electricity Market Statistics* (「2025 전력시장통계」), overview of annual electricity market statistics (printed p. 29; traded volume provisional)See in sources →.
Data Korea Power Exchange (KPX), *2025 Electricity Market Statistics*·© Renuary
It is as if you kept ten cars ready to drive at any moment, and the distance they covered in a year added up to what a little over four cars would cover driving around the clock. That does not mean the other six sat idle the whole time.
The rest still need fuel in the tank and servicing, so money is paid for having them ready in itself. This is the Capacity Payment (CP) A capacity payment is paid for the available capacity a generator bids, apart from its output. It covers fixed costs, such as construction, that SMP alone can hardly recover. Glossary →.Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources → It is like a fire station that stays open on days when nothing is burning.
The fourth is a margin always kept free. The headroom that can fill the gap right away even if a big generator suddenly stops is the Reserve Margin The reserve margin is the spare supply (reserve) secured above electricity demand, expressed as a ratio to demand. It shows the safety buffer against generator failures or sudden jumps in demand. Glossary →. Holding the frequency steady and supplying this headroom are paid for separately, as Ancillary Services Services generators and others provide, beyond producing power, to keep the grid stable. They include frequency regulation, reserves, reactive power and black start. Glossary →. It is a price paid not for "how much" electricity was made but for "being able to match at any moment."
As the margin shrinks, each stage has its set actions. Today's rules divide the stages by how much margin is left. They look separately at the supply capacity secured above demand (the supply reserve) and at the headroom that can be drawn on within 30 minutes to hold the frequency or after a generator fails (the operating reserve). If the supply reserve falls below 5,500 MW, the "Ready" stage begins and more supply capacity is gathered in. If the operating reserve falls below 1,500 MW, a "Serious" alert is issued and part of the demand from those who use power (the load) is cut.Source 7Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.4 para. 3the "Ready" stage is based on the supply reserve, the "Concern" to "Serious" stages on the operating reserve (also noted on KPX's peak-load forecast page). The version in force from 2026-10-31 has the same provision (Art. 5.1.4 para. 3)See in sources →Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources →
The estimated margin that day in 2011, 240,000 kW, is 240 MW. But it was estimated after the event, so it is not set side by side with today's alert lines.
Why do "KEPCO in the red" and "SMP soars" show up together?
The electricity tariff paid at home goes first to KEPCO. With that money KEPCO pays for the electricity it bought in the market, and builds and maintains the wires and Substation A substation is a site with equipment that raises or lowers the voltage of electricity and passes it on to the next part of the grid. Glossary → (places that take in electricity from outside, change it with equipment such as transformers, and send it back out).Source 8*Technical Standards for Electrical Facilities* (「전기설비기술기준」, Notice No. 2025-18, issued and in force 2025-10-01; unofficial translation), Art. 3 para. 1 item 2 (definition of a substation); Korean Law Information Center, administrative rule serial no. 2100000267908See in sources → What it pays in the market passes through KPX's settlement and is shared out to the generation companies. The tariff and the wholesale price are linked through KEPCO, but they are not the same price.
The bill goes through KEPCO and KPX settlement to generators; electricity flows the other way.
That is why "KEPCO in the red" and "SMP soars" so often turn up in the same article. KEPCO buys electricity in the market at prices based on the SMP (for power from the generation subsidiaries, the share above fuel cost is reduced by the Settlement Adjustment Factor It adjusts the settlements of generators at KEPCO majority-owned companies and of central-dispatch coal units. The rules place it among measures for power price stability. Glossary → before payment), and sells it under a government-approved tariff. When the buying price rises and the selling price stays put, the gap piles up as KEPCO's losses. At the fish auction, it is as if the auction price leaps while the corner shop's prices are frozen.
In an ordinary market, the seller and the buyer set the price, and once the goods change hands, that's that. The electricity market has one more player in between: an operator who upholds the laws of physics. Whoever agreed to sell at whatever price, on the wires supply and demand must match at every moment.
So power news has two layers laid one over the other.
- The money layer: who gets paid how much, whether the SMP went up, whether KEPCO's losses grew.
- The electricity layer: which generators ran and when, how much margin is left. A "reserve alert" belongs here.
The two are linked, but they are not the same.
Same number, but compared with what?
When you use these numbers in a report or analysis, there are three places they can trip you up.
- The 2011 "margin of 240,000 kW" was estimated by the government after the event, so do not compare it directly with today's alert lines.
- In an alert story, look for MW before %. The rules set the alert stages in MW.Source 2Korea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation)See in sources →
- "About 43%" was worked out from facilities in place at the end of 2025. If facilities were added during the year, it comes out lower than reality. The 2025 traded volume is a provisional figure.
Where does the refrigerator get its power at 11 p.m.?
A home that uses 300 kWh (kilowatt-hours, the amount of electricity used) a month uses about 10 kWh a day. Those 10 kWh are not taken out of something stockpiled beforehand. At 11 p.m., when the refrigerator compressor hums to life, generation output across the whole power grid is adjusted at that very moment to cover the compressor's extra draw.
There is no telling which plant's electricity reached your home, because it all mixes together on the wires. The money for it goes through KPX's settlement to the generation companies, and comes back to your home as KEPCO's bill.
The company names and numbers in electricity news can be sorted into four strands.
- A blackout or alert story: how much reserve was left? What matters is the generating headroom that can be drawn on right away when needed.
- A story that the SMP went up: how much did the price of buying electricity in the electricity market change? Don't read it as the same number as the tariff you pay at home.
- A story about KEPCO's profit or loss: how did what it paid into the market differ from the tariff it collected from consumers? Look at the gap between the buying price and the selling price.
- A comparison of facilities and generation: does it tell generating capability in MW apart from actual traded volume in GWh? They are not the same quantity.
A plan drawn up the day before, a price that changes by the hour, money paid even on days a facility doesn't run, a margin always kept free. All of these are mechanisms put in place because electricity is hard to stockpile. 3:11 p.m. on September 15, 2011 was the moment that showed what happens when those mechanisms all loosen at once.
Words in this piece
- Frequency Frequency is how fast alternating current changes direction; it signals whether supply and demand balance. It falls when supply is short and rises when there is a surplus. Glossary → — electricity's beat. It is the first thing to wobble when the amount made and the amount used drift apart.
- Dispatch and Merit Order Dispatch is KPX telling generators when and how much to run. In principle it follows the market's priority order: generators with the lowest variable cost run first. Glossary → — the operator instructing, moment by moment, which generators to run and how much.
- SMP (System Marginal Price) SMP is the energy price set for each trading hour in the power market. It is the highest generation price among the generators eligible to set the price in that hour. Glossary → — the wholesale price of electricity, set for each hour (System Marginal Price).
- Capacity Payment (CP) A capacity payment is paid for the available capacity a generator bids, apart from its output. It covers fixed costs, such as construction, that SMP alone can hardly recover. Glossary → — money paid for facilities kept ready to run at any time, separate from what is paid for the electricity sold.
- Reserve Margin The reserve margin is the spare supply (reserve) secured above electricity demand, expressed as a ratio to demand. It shows the safety buffer against generator failures or sudden jumps in demand. Glossary → — headroom always left spare, so the gap can be filled right away even if a big generator stops.
- Ancillary Services Services generators and others provide, beyond producing power, to keep the grid stable. They include frequency regulation, reserves, reactive power and black start. Glossary → — holding the frequency steady and supplying headroom to fill sudden gaps, and the payment for that work.
- Settlement Adjustment Factor It adjusts the settlements of generators at KEPCO majority-owned companies and of central-dispatch coal units. The rules place it among measures for power price stability. Glossary → — a factor multiplied only into the share above fuel cost in what generation subsidiaries and others are paid, to reduce it (more in "Same price, different paycheck").
- Distribution line / distribution network The distribution network carries electricity from substations to neighbourhoods, homes and factories; each circuit in it is a distribution line. Glossary → — the wires that carry electricity from substations out to neighborhoods and homes.
Sources (9)
Sources
- Ministry of Climate, Energy and Environment, *Standards for Maintaining Power System Reliability and Electricity Quality* (「전력계통 신뢰도 및 전기품질 유지기준」, No. 2025-165, in force from 2025-10-01; unofficial translation), Art. 4 ↩
- LawKorea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.1 Drawing up the day-ahead generation schedule· Art. 5.1.4 (Measures when operating reserve falls or is expected to fall)· Art. 5.2.1 Drawing up the real-time dispatch schedule· Art. 5.3.1 Dispatch instructions· Art. 2.4.2 Determination of the system marginal price· Art. 2.4.3 Determination and disclosure of the capacity price· Art. 5.6.1 Securing ancillary services (article titles: unofficial translation) ↩
- ReleaseGovernment of Korea (joint), *Results of the joint government investigation into the causes of the September 15 power outage* (「정부 합동 9·15 정전사태 원인 조사 결과 발표」, Korea Policy Briefing, 2011-09-26; unofficial translation) ↩
- ReleaseMinistry of Knowledge Economy, *Minister's briefing on measures following the power outage* (「지식경제부 장관 정전사태 대책 브리핑」, Korea Policy Briefing, 2011-09-18; unofficial translation) ↩
- DataKorea Power Exchange (KPX), *2025 Electricity Market Statistics* (「2025 전력시장통계」), overview of annual electricity market statistics (printed p. 29; traded volume provisional) ↩
- LawMinistry of Climate, Energy and Environment, *Enforcement Rule of the Electric Utility Act* (「전기사업법 시행규칙」, Ministerial Ordinance No. 63, in force from 2026-10-16; unofficial translation), Art. 18· Annex 3 item 2 (standard frequency 60 Hz, tolerance within 0.2 Hz above or below) ↩
- LawKorea Power Exchange (KPX), *Electricity Market Operation Rules* (「전력시장운영규칙」, version in force from 2026-07-25; unofficial translation), Art. 5.1.4 para. 3 ↩the "Ready" stage is based on the supply reserve, the "Concern" to "Serious" stages on the operating reserve (also noted on KPX's peak-load forecast page). The version in force from 2026-10-31 has the same provision (Art. 5.1.4 para. 3)
- Release*Technical Standards for Electrical Facilities* (「전기설비기술기준」, Notice No. 2025-18, issued and in force 2025-10-01; unofficial translation), Art. 3 para. 1 item 2 (definition of a substation); Korean Law Information Center, administrative rule serial no. 2100000267908 ↩
- Korea Electric Power Corporation (KEPCO), *Restructuring of the Power Industry* (「전력산업 구조개편」, official history) ↩six generation companies launched 2001-04-02· Korea Power Exchange, *Company Overview* (「회사개요」, established 2001-04-02; unofficial translation)