Fifteen minutes later, the two companies parted with smiles. But no follow-up came. It was not because the contract terms were bad. It was because they never checked when the electricity each side needed would be ready.
This scene is a hypothetical case. Of the two business cards, one belongs to a manufacturer that will soon need electricity; the other belongs to a developer with a 100 MW solar PV project that has just found its land. The size looked impressive, so the conversation began. But before the developer can supply electricity, there is a wait. A good company and the right partner for now can be two different things.
There is no need to finish a contract at the first meeting. A deal to buy and sell electricity starts by matching who the other side is, what is needed, and when it can happen. The Korea Energy Agency's direct PPA brokerage platform also walks users through participant eligibility checks, listing registration, term proposals, and matching, in that order.Source 1Korea Energy Agency, *Renewable Energy Direct Power Trading (PPA) Brokerage Platform* (「재생에너지 직접전력거래(PPA) 중개플랫폼」, checked 2026-10-30; unofficial translation), usage steps 'participant eligibility check → listing registration → term proposal → PPA matching'. We do not read the platform's steps as a statutory order imposed on every deal.See in sources → The first meeting sits at the very front of that line: it is where you pick the partners worth matching with.
Before business cards, match dates
For someone looking for a home, a large new apartment is not always the right answer. If you have to move next month, a home you can only move into a few years from now is no help right away. Power plants are the same. A 100 MW project still in development and a 20 MW plant already in operation differ fivefold in installed size. But ask about the date you can use the electricity, and the answers can come out the other way around.
When a plant can supply depends on what stage it is at. It makes a difference whether it is still looking for land, has received a generation business license, is under construction, or has already started commercial operation. The generation business license is the legal threshold that anyone wanting to run the business must cross. A contract states the first supply date and the facility and supply terms separately.Source 2*Electric Utility Act* (「전기사업법」), Art. 7 (version effective 2026-09-18)the legal basis for licensing a generation business. The license and construction status of a specific project require their own evidence.See in sources → So wherever you ask about a plant's size, the date it can supply belongs on the table too.
Ink dot = project, orange dot = buyer. Box labels are examples.
Seven questions on one sheet
What to ask the other side can be boiled down to seven boxes. This table does not replace a contract. Instead, when the first meeting ends, it helps you decide whether to meet again or look for another partner, and which documents to request.
| Question | What to ask at the first sitting | Why ask |
|---|---|---|
| Who are you? | What is the company's role? Can the person here decide, or connect you to the next person in charge? | Generation companies, electricity users and procurement service companies differ in eligibility and role. The trading process also begins with checking participant eligibility.Source 1Korea Energy Agency, *Renewable Energy Direct Power Trading (PPA) Brokerage Platform* (「재생에너지 직접전력거래(PPA) 중개플랫폼」, checked 2026-10-30; unofficial translation), usage steps 'participant eligibility check → listing registration → term proposal → PPA matching'. We do not read the platform's steps as a statutory order imposed on every deal.See in sources → |
| What do you offer? | Electricity, renewable energy certificates (RECs), project rights, construction, or a procurement service? | The means of renewable energy use confirmation split into REC purchases, PPAs, self-consumption and others. One offer does not stand in for another means.Source 3Korea Energy Agency, New and Renewable Energy Center, *Renewable Energy Use Confirmation (K-RE100)* (「재생에너지 사용 확인(K-RE100)」, checked 2026-10-30; unofficial translation), guidance on means of fulfillment such as RECs, PPAs and self-consumption, and on use confirmation.See in sources → |
| What are you looking for? | A buyer of electricity, an investor, a contractor to build the plant, or a company to procure on your behalf? | Even for the same solar PV project, someone who wants to buy the electricity and someone who would invest at the development stage want different things.Source 1Korea Energy Agency, *Renewable Energy Direct Power Trading (PPA) Brokerage Platform* (「재생에너지 직접전력거래(PPA) 중개플랫폼」, checked 2026-10-30; unofficial translation), usage steps 'participant eligibility check → listing registration → term proposal → PPA matching'. We do not read the platform's steps as a statutory order imposed on every deal.See in sources → |
| When? | From what date is it needed, and from what date can it actually be supplied? | The planned first supply date and the contract term are core terms of a deal. If the timelines for development, reporting and supply preparation are out of step, the contract slips away even when the size fits.Source 4Ministry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Notice No. 2025-61, partially amended 2025-12-18· effective 2025-12-24, checked 2026-10-30; unofficial translation), Art. 9 (required contract items)· Art. 10 (reporting of the planned supply date).See in sources → |
| How much? | Installed size stated in MW, or energy to be supplied or used stated in MWh? | Installed capacity and annual guaranteed supply are different values. A contract has to compare the amount needed and the amount that can be supplied in the same unit and over the same period.Source 4Ministry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Notice No. 2025-61, partially amended 2025-12-18· effective 2025-12-24, checked 2026-10-30; unofficial translation), Art. 9 (required contract items)· Art. 10 (reporting of the planned supply date).See in sources → |
| How ready? | Looking for land, or at the license, construction or operating stage? | The "planned volume" of a project at the license stage and the "volume available to supply" from a plant in operation carry different risks and call for different documents.Source 2*Electric Utility Act* (「전기사업법」), Art. 7 (version effective 2026-09-18)the legal basis for licensing a generation business. The license and construction status of a specific project require their own evidence.See in sources → |
| What's next? | Which documents will you get from whom, and on what day will you meet again to match terms? | Only after terms are discussed does a deal move to matching and contracting. Supply limits or suspension and how to handle shortfalls are also contract questions to check at the next sitting.Source 5The same *Notice on Direct Power Trading of Renewable Electricity, etc.* (checked 2026-10-30), Art. 6 (shortfall energy), Art. 12 (contract termination), Arts. 27 and 29 (provisions on trading limits, suspension, compensation and damages). How risk is shared under a specific contract is a matter for review of the individual agreement.See in sources → |
The grouping and order of the seven questions are Renuary's editorial suggestion, not a statutory checklist.
Data Korea Energy Agency, [*Renewable Energy Direct Power Trading (PPA) Brokerage Platform*](https://www.ppa-energy.kr/) (「재생에너지 직접전력거래(PPA) 중개플랫폼」, checked 2026-10-30; unofficial translation) · Ministry of Climate, Energy and Environment, [*Notice on Direct Power Trading of Renewable Electricity, etc.*](https://www.law.go.kr/LSW/admRulLsInfoP.do?admRulSeq=2100000274036) (「재생에너지전기의 직접전력거래 등에 관한 고시」, effective 2025-12-24, checked 2026-10-30; unofficial translation)·© Renuary
It is fine if you cannot fill in the whole table. Leave what you do not know blank. But if "What do you offer?" and "What are you looking for?" point to different deals, or the supply dates do not line up, then trading glossy proposals first is doing things in the wrong order.
Ask once more about '100 MW'
100 MW is the amount of power a plant can put out. To compare it with the electricity a factory actually uses, you need MWh, the energy over a given period. Just as a car's engine size differs from the distance it actually drove, solar PV plants with the same MW make different MWh depending on how often they generate. The word for handling that difference is Capacity Factor Capacity factor is the ratio of how much a plant actually generated to the maximum it could have produced. Plants of the same size can deliver very different output depending on their capacity factor. Glossary →.
So when you hear "we supply 100 MW," ask again. 100 MW of what? Is it the installed capacity of the plant, or the volume that can actually be delivered under a contract? A contract lists items such as annual guaranteed supply, trading price and term separately.Source 4Ministry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Notice No. 2025-61, partially amended 2025-12-18· effective 2025-12-24, checked 2026-10-30; unofficial translation), Art. 9 (required contract items)· Art. 10 (reporting of the planned supply date).See in sources → Build a scoring sheet that mixes MW and MWh without checking these boxes, and the more precisely you add up the numbers, the higher the wrong partner scores.
With many candidates, screen first, then score
When many companies ask for a meeting, it becomes hard to meet each one. At that point the first step is not scoring but screening out partners whose deal purpose and supply timing do not fit. What if you seat a company that only offers construction services across from a company looking for electricity, or seat only early-stage development projects across from a company that needs power supplied right away? Even if you give high scores on other terms, the conclusion gets blurry.
Then line up the remaining candidates' timing, volume, readiness and terms side by side. For a buyer in a hurry, timing may weigh more; for someone looking to invest at the development stage, licensing and readiness may matter more. Do not fill unknown boxes with any score that comes to hand; leave them as "to be checked." The score weights are just a tool you set each time to fit the meeting's purpose, not an answer key accepted across the market.
An editorial suggestion by Renuary, not a legal checklist or industry standard.
Questions that remain even with the right partner
Finding a partner worth meeting again does not finish the deal. What remains is how to cover a shortfall in generation, who bears what responsibility if supply is restricted, and how to set the contract price and term. The notice on direct power trading also deals separately with contract content and with supply shortfalls and limits.Source 5The same *Notice on Direct Power Trading of Renewable Electricity, etc.* (checked 2026-10-30), Art. 6 (shortfall energy), Art. 12 (contract termination), Arts. 27 and 29 (provisions on trading limits, suspension, compensation and damages). How risk is shared under a specific contract is a matter for review of the individual agreement.See in sources → Rather than negotiating all of this at the first meeting, focus on confirming which risks to review in the next conversation.
Ask separately, too, "Does it count as renewable energy?" A plant producing electricity and a company providing evidence that it used renewable energy are not the same thing. The use confirmation procedure required differs depending on the means of procurement, such as REC purchases or a PPA.Source 3Korea Energy Agency, New and Renewable Energy Center, *Renewable Energy Use Confirmation (K-RE100)* (「재생에너지 사용 확인(K-RE100)」, checked 2026-10-30; unofficial translation), guidance on means of fulfillment such as RECs, PPAs and self-consumption, and on use confirmation.See in sources → Being able to supply electricity does not mean a company's use confirmation is also done.
2 minutes, 5, 5, 3
If you set this hypothetical meeting at 15 minutes, you could split it like this. In the first 2 minutes, each side says its role and what it is looking for. In the next 5 minutes, match the timing, size and readiness each side needs. In the following 5 minutes, sort out where things fit, where they diverge, and what additional documents to get. In the last 3 minutes, set the person in charge and the date for the next meeting. This is not a standard set by law or by the industry; it is an example to help run the meeting.
Even if you like each other's companies, when you need things at different times there is no need to rush into contract talk on the spot. Conversely, if a partner is a little smaller but can provide the needed electricity on time and the terms can be reviewed, there is reason to put it on the list for the next meeting. That is also why the brokerage platform splits the process into eligibility, registration, terms and matching: so that a deal does not end with a single introduction.Source 1Korea Energy Agency, *Renewable Energy Direct Power Trading (PPA) Brokerage Platform* (「재생에너지 직접전력거래(PPA) 중개플랫폼」, checked 2026-10-30; unofficial translation), usage steps 'participant eligibility check → listing registration → term proposal → PPA matching'. We do not read the platform's steps as a statutory order imposed on every deal.See in sources →
- 2 minWhy we are here
- 5 minMatch key terms
- 5 minFits, gaps, data needed
- 3 minAgree next steps
- ⚑ Next meeting
The split is the article’s example. Too short to sign, long enough to decide on a next step.
Back to the two business cards on the table
Return to the manufacturer and the developer from the start. Had the two companies first asked "When is it needed?" and "How far along is it?", they would have realized they were not the right match for now. It might have been more fitting for the buyer to look for a plant already in operation, and for the developer to look for an investor who can wait while the project is developed.
They parted with smiles and no follow-up came because those questions were missing. If, after the seven questions, a sheet of paper holds the name of the person in charge, a date and the documents to check, the meeting is already different from one that leaves only business cards. A first meeting does not succeed by stamping a contract. It succeeds when both sides know which blanks to fill in the next conversation.
Words in this piece
- MW and MWh MW (megawatt) and MWh (megawatt-hour) are kW and kWh scaled up to the mega unit. They are used for large values such as plant size or power market volumes. Glossary → — MW is the size of power; MWh is the energy over a period of time.
- Capacity Factor Capacity factor is the ratio of how much a plant actually generated to the maximum it could have produced. Plants of the same size can deliver very different output depending on their capacity factor. Glossary → — the ratio of a plant's actual generation to what it would have made running continuously at full output over a given period.
- PPA (Power Purchase Agreement) A PPA is a long-term power sale contract. In Korea the typical form is direct power trading (direct PPA): renewable power supplied to companies and others outside the power market. Glossary → — a power purchase agreement under which an electricity user such as a company receives generated electricity on agreed terms.
- REC (Renewable Energy Certificate) A REC is the issuing and trading unit of a certificate proving renewable supply. Renewable generators earn income from selling RECs, apart from selling electricity. Glossary → — a renewable energy certificate that provides evidence that renewable energy was supplied and is used in trading.
- EPC (engineering, procurement and construction) EPC is a contract under which one company designs a power plant, buys its equipment, builds it and hands it over. Glossary → — carrying out the engineering, procurement and construction of a generating facility as one package.
Sources (5)
Sources
- Korea Energy Agency, *Renewable Energy Direct Power Trading (PPA) Brokerage Platform* (「재생에너지 직접전력거래(PPA) 중개플랫폼」, checked 2026-10-30; unofficial translation), usage steps 'participant eligibility check → listing registration → term proposal → PPA matching'. We do not read the platform's steps as a statutory order imposed on every deal. ↩
- Law*Electric Utility Act* (「전기사업법」), Art. 7 (version effective 2026-09-18) ↩the legal basis for licensing a generation business. The license and construction status of a specific project require their own evidence.
- Korea Energy Agency, New and Renewable Energy Center, *Renewable Energy Use Confirmation (K-RE100)* (「재생에너지 사용 확인(K-RE100)」, checked 2026-10-30; unofficial translation), guidance on means of fulfillment such as RECs, PPAs and self-consumption, and on use confirmation. ↩
- LawMinistry of Climate, Energy and Environment, *Notice on Direct Power Trading of Renewable Electricity, etc.* (「재생에너지전기의 직접전력거래 등에 관한 고시」, Notice No. 2025-61, partially amended 2025-12-18· effective 2025-12-24, checked 2026-10-30; unofficial translation), Art. 9 (required contract items)· Art. 10 (reporting of the planned supply date). ↩
- ReleaseThe same *Notice on Direct Power Trading of Renewable Electricity, etc.* (checked 2026-10-30), Art. 6 (shortfall energy), Art. 12 (contract termination), Arts. 27 and 29 (provisions on trading limits, suspension, compensation and damages). How risk is shared under a specific contract is a matter for review of the individual agreement. ↩